Thursday, October 13, 2016
Thursday, October 6, 2016
OCT. MIDTERM SCHEDUAL
OCT.5 W
Grid Cut
OCT.7 F
Massing Refine
OCT.10 M
Massing Completed (Pinup)
OCT.12 W
Grid Refine (Program Organized)
OCT.15 F
Grid Finished
OCT.
17 M
Pinup (Grid, Program), Envelop Strategy (Lecture)
OCT.
19 W
Envelop, Entrance, Aperture,
Circulation, Ground, Phase I&II
OCT.
21 F
Desk Critic
OCT.
24 M
Pre-Midterm Pinup, Model Required, Put On Site
OCT.
26 W
Production
OCT.
28 F
Production
OCT.
31 M
Midterm
Subscribe to:
Posts (Atom)